PB2
Equipping a Project Laboratory is one of the answers of Geo & Hydro to fast turn
around and quality (i.e. comparable) results.
Here a lab set-up in a garage shed in south Luxembourg was required
during several large excavations on sites within a radius of 100 km.
Typical turn around time of the samples is 30 minutes.